Situation
You have an approved PRD. Now you need to break it into Jira tickets, assign story points, and get it into the current sprint — without losing the context that went into the PRD.
What you need
Steps
1. Open the PRD in Documents
Go to Documents and open the approved PRD.
2. Generate tickets
Click Generate tickets in the top toolbar. Specky reads the PRD and generates:
Each ticket inherits the PRD's evidence links — so the engineer can always trace a ticket back to the customer signal that motivated it.
3. Review and adjust
The ticket preview shows all generated tickets in a list. You can:
4. Push to Jira
Click Push to Jira. Choose:
All tickets are pushed with:
5. Track progress
Specky monitors the Jira tickets and updates their status in your Product Graph. When all tickets in a PRD are marked Done, Specky flags the PRD as "shipped" and prompts you to link an outcome experiment.
Output
Variations
Linear instead of Jira? Same flow — Settings → Integrations → Linear. Push targets Linear issues instead of Jira tickets.
Large feature? For PRDs with more than 10 stories, push the epic first and push stories in batches by sprint.
No PRD yet? Ask AI Chat to draft the PRD first (see the [Gong cookbook](/docs/cookbook-prd-from-gong)), then come back to this flow.